• ABOUT US
    • COMPANY IN BRIEF
    • CUSTOMER SATISFACTION
    • QUALITY STATEMENT
    • CORPORATE SOCIAL RESPONSIBILITY
    • COMPANY OBJECTIVES
    • BUSINESS SCOPE IN GENERAL (END TO END)
    • BUSINESS SCOPE (EXPANSION)
    • VISION AND MISSION
    • BOARD OF DIRECTOR
    • COMPANY OVERVIEW - COMPANY STRUCTURE
    • HOLDING COMPANY STRUCTURE
    • COMPANY LOCATION MAP
  • OUR SERVICE
    • OUR SERVICES
    • RADIO NETWORK PLANNING & DESIGN
    • RADIO NETWORK OPTIMIZATION
    • RF NETWORK AUDIT
    • FREQUENCY PLANNING & INTERFERENCE ANALYSIS
    • DRIVE TEST MEASUREMENT & ANALYSIS
    • SITE SURVEYS AND NETWORK ENGINEERING SERVICES
    • NETWORK ROLL-OUT ( NRO )
    • NETWORK ROLL OUT (RBS AND MINILINK)
    • INSTALLATION & COMMISIONING
    • CIVIL MECHANICAL AND ELECTRICAL
    • TELECOM IN-BUILDING SOLUTIONS INFRASTRUCTURE
    • OPERATION & MAINTENANCE SERVICES
    • HUMAN RESOURCE PROVISIONING
  • SUPPORT
    • CERTIFICATIONS FOR COMMITMENT
    • HEALTH AND SAFETY
    • EVANTAMA MONITORING PROJECTS
    • PROJECT MANAGEMENT TEAM
  • OUR CUSTOMER
    • OUR CUSTOMER
    • LIST OUR EXPERIENCE
    • TALENTA IMPLEMENTATION – HC & QUALITY
  • CAREER
  • GALERY
  • CONTACT US

OUR CUSTOMER

LIST OUR EXPERIENCE

1. NETWORK ROLL OUT

XL PROJECT
2009 - 120 Sites Service for Add Antenna Installation Jabodetabek Batch 1
- 135 Sites Service for Add Antenna Installation Serang & Cilegon Batch 1
- 150 Sites Dismantle Antenna Jabodetabek
- 150 Sites Service for Add Antenna Installation Tangerang - serang Batch 2
2010 - 245 Sites Install Antena,Rbs ,3 Sector x Pol Jabodetabek
- 160 Sites Dismantle RBS on 0599 (UL,OL1,3G) Jabodetabek
- 75 Replace w/ RBS 6201 due to Stolen Bogor – Sukabumi
- 40 Service Link FO - Jabodetabek
2011 - Maintenance Service for Installation ,Dismantle, Packing and Delivery for Jabodetabek & Central Java
- Dismantle and Installation Feeder cable due to stolen for Jabodetabek Area.
- Support material delivery to warehouse after dismantle for jabodetabek & Central Java.
2012 - 250 Swap RBS UL & antenna
- 250 Dismantle, Antenna, RBS 3 Sector
- 250 Install Antenna RBS 3 Sector X-Pol
- 250 Add Antena HighGain _XX
- Reheight Antenna OL1
- Service Swap Ant Vpol to Xpol 3Band.
2013 - 145 Swap Antena Highgain
- 90 Add Antenna Highgain
- 150 Swap RBS , Re-location due to Outdoorization
2014 - 150 Swap Antenna to 3Band
- 115 Replace w/RBS 6201 due to stolen
- 150 Swap RBS to 6201
- 45 Dismantle UL+OL1+3G due to contract
2015 - 150 Swap Antenna to 3Band
- 115 Replace w/RBS 6201 due to stolen
- 150 Swap RBS to 6201
- 45 Dismantle UL+OL1+3G due to contract
2016 - 70 UL,OL1,OL2,3G Dismantle DueTo Reloc
- 141 Dismantle & Install
2017 - 49 Dismantle(UL+3G+4G)
- 15 Dismantle RBS&DAS
2019 - Dismantle Antena and RBS for XL jabodetabek Area
- Relocation equipment RBS and Antena XL Jabodetabek
2020 - Relocation Project
ISAT PROJECT
2009 - Relocation Site Sumbagut area.
- nstallation RBS & Antenna under ZTE Sulawesi Area
ERICSSON PROJECT
ITC XL
2017 - 2020
- Swap RBS Area Becikar Jabo 2
- CME Jabo 2
- End to End project NDO –NRO for Rollout implementation, Sunrise and Orion Project
- End to End project H2 for Jabo 1 & central Java
ITC TSEL
KALIMANTAN 2018
Modernization
ITC ISAT
2017 - 2020
- New Site Umbrella 2
- 4T4R
- Multi Band Channel ( MBC )

- Survey - Delivery Material
- Rollout implementation, AOP and Snapshot project
- End to End ( NRO-NDO ) implementing new & modernization for isat project 2019-2020
HUAWEI PROJECT
- Implementing Roll out installation Wireless & microwave for Huawei H3i project in jabodetabek.

LIST OUR EXPERIENCE

2. CIVIL MECHANICAL AND ELECTRICAL (CME)

IFORTE PROJECT
2016 - New Site Pole 20M,Internux Project Jabodetabek
ISAT PROJECT
2010 - Relocation Site Sumatera area
XL PROJECT
2012 - As Tower Provider for rent to XL
ERICCSON INDONESIA PROJECT
2018-2019 - CME for RBS Foundation area Jabodetabek

3. NETWORK DESIGN AND OPTIMIZATION

ERICCSON PROJECT
TSEL
2010-2016
- RF Engineer 2G,3G Sumbagut
- STS Engineer Tsel Sumbagut
- NPI 2G, 3G RF Sumbagut
- OSS Eng Tsel Sumbagsel
- Optimization 2G,3G Tsel Kalimantan
- Tsel Kalimantan Optimization Workpackage
- Tsel Blue Eagle Drive Test Kalimantan
ISAT
2010-2019
- RF Engineer 2G,3G Jabo
- OSS Isat Swap & Modernization Jabo
- 2G,3G Isat MBC Jabo

- Isat RF Eng NPI 3G Project - STS data processing Isat NPI Project

- Isat 3G Project – RF Engineer - Tuning and Optimization AOP and Snapshot project
XL
2010-2019
- STS Engineer XL core
- XL NPI 2G,3G Jabo
- XL ND & Initial Tuning 2G, 3G Jabo
- XL Swap Central Java , RF & Optim Engineer
- XL Swap Central Java DT
- Tuning and Optimization, Swap Antenna, Relocation, Sunrise and Orion Project
AXIS 2G MS Axis
XL PROJECT
2011 - 390 site Walk Test IBS Jabodetabek , Sulawesi & Sumatera area
2016 - 2 Weeks trial for Drive Test Inner jabo 4G
2019 - Optimization for Orion Project
2020 - Optimization for H2 Project
ISAT PROJECT
2010-2015 -Drive Test & Benchmarking Jaguar 20 Big Cities
2014-2015 - Service BSS Benchmarking Drive Test Railway & Drive test on Demand Central Java, Kalimantan
- Service BSS Benchmarking Drive Test BRTI & Drive Test on Demand, Java & Kalimantan.
- Optimization for Umbrella project

LIST OUR EXPERIENCE

1. NRO/TE/TI

Ericsson – XL (NRO/Roll Out)
2022 - 1 Site program 2020 - Coverage CJ
- 26 Sites program 2021 - Capacity H2 CJ
- 4 Sites program 2021 - Coverage CJ
- 13 Sites program 2021 - Coverage H2 CJ
2021 - 502 Sites program H1 (JABO)
- 976 Sites program H1 (Central Java)
- 113 Site program H2 (Central Java)
2020 - 109 Sites Program JEDI 2020
- 9 Sites Program STP Relocation 2019
2019 - 195 Sites project H2 2019 – Coverage area JABO2
2018 - 300 Sites program XL JABO Outering1
2017 - 49 Dismantle(UL+3G+4G)
- 15 Dismantle RBS&DAS
- Swap RBS Area Becikar area Jabo 2
- CME Jabo 2
2016 - 70 UL,OL1,OL2,3G Dismantle Due To Relocation
- 141 Dismantle & Install
2015 - 137 Dismantle Ant 2G_Ant_Simply
- 90 LEB16_3412013G_Swap to RRUS12
- 137 Dismantle due to contract
- 137 Dismantle Ant 3G_Ant_Simply
2014 - 150 Swap Antenna to 3Band
- 115 Replace w/RBS 6201 due to stolen
- 150 Swap RBS to 6201
- 45 Dismantle UL+OL1+3G due to contract
2013 - 145 Swap Antenna High gain
- 90 Add Antenna High gain
- 150 Swap RBS , Re-location due to Outdorization
2012 - 250 Swap RBS UL & antenna
- 250 Dismantle, Antenna, RBS 3 Sector
- 250 Install Antenna RBS 3 Sector X-Pol
- 250 Add Antenna High Gain _XX
- Re-height Antenna OL1
- Service Swap Ant Vpol to Xpol 3Band
2011 - Maintenance Service for Installation ,Dismantle, Packing and Delivery for Jabodetabek & Central Java
- Dismantle and Installation Feeder cable due to stolen for Jabodetabek Area.
- Support material delivery to warehouse after dismantle for jabodetabek & Central Java
2010 - 245 Sites Install Antena,Rbs ,3 Sector x Pol Jabodetabek
- 160 Sites Dismantle RBS on 0599 (UL,OL1,3G) Jabodetabek
- 75 Replace w/ RBS 6201 due to Stolen Bogor – Sukabumi
- 40 Service Link FO
- Jabodetabek
2009 - 120 Sites Service for Add Antenna Installation Jabodetabek Batch 1
- 135 Sites Service for Add Antenna Installation Serang & Cilegon Batch 1
- 150 Sites Dismantle Antenna Jabodetabek .
- 150 Sites Service for Add Antenna Installation Tangerang
- serang Batch2
Ericsson – Telkomsel (NRO/Roll Out)
2022 - 104 sites program TELKOMSEL KALIMANTAN 2021
- 119 sites program TELKOMSEL KALIMANTAN 2022
2021 - 6 sites program 5G NR 2300 30 MHz
- 26 sites program CP#2 Reengineering Nation Wide 2021
- 713 sites program settlement 1 – 11 2021
2020 - 18 Sites program CP#1
- #3 2020
- 4 Sites program relocation batch1 – 3 2020
- 36 Sites program settlement 1
- 5
2018 - 115 SOW modernization activity
2011 - 280 Sites for implementing for MSAN Telkom
- 50 ITC New Site BSS Tsel Sulawesi area
Ericsson – Indosat (NRO / TE)
2021 - 64 Sites program battle Q1 2021
- 56 Sites program battle Q2 2021
- 91 Sites program battle Q3 2021
- 93 Site program battle Q4 2021
- 29 Sites program 5 Cities Project – RAN
2020 - 71 Sites program 5 Cities Project – RAN
- 34 Sites program AOP 2020
2019 - 585 Sites program AOP 2019 Priority 1A
- 10 Sites program AOP 2019 Priority 1B
- 49 Sites program AOP 2019 Priority 2A
- 75 Sites program snapshot 2019
2018 - 503 Sites program 4G Overlay Coverage
- 410 Sites program AOP2018 H2-Capacity Platinum
- 287 Sites program H2 2018 Expansion Program
- 50 Sites program ISAT 162PB Phase 2
- 200 Sites program ISAT Umbrella 2&3 162 PB
2017 - New Site Umbrella 2
- 4T4R
- Multi Band Channel ( MBC )
- Survey
- Delivery Material
2010-2011 - Relocation Site Sumbagut area
- Installation RBS & Antenna under ZTE Sulawesi Area
Ericsson – Indosat (TRM)
2022 - 1 Site Battle 2 - Ph3
- 12 Sites Battle 2 - Ph3 New Site
- 53 Sites Battle 6 - Capacity Expansion
- 143 Sites Battle 6 - New Site
- 4 Sites MOCN Trial 2022
- 73 Sites Site Survey
2019 - 1 Site Battle 2 - Ph3 - 59 Program TRM_4GOVERLAY_NS_ADDONCAP area North Sumatera
- 136 Program ET - 2018_4G Overlay SLPP AddOnAndCap & AOP2019 4GOverlayAddOn-TranspMWforSwapSLPP area Sulawesi

2. NDO/RF/NPO

Ericsson – Indosat (NDO / RF)
2022 - 2 Sites Battle 2 - Ph3
- 2 Sites Battle 2 - Ph3 New Site
- 45 Sites Battle 6 - Capacity Expansion
- 44 Sites Battle 6 - New Site
- 23 Sites ESTA SW Upgrade 87 sites
- 2 Sites MOCN Trial 2022
2021 - 44 Sites Q1 AOP 2021
- 54 Sites battle 2 phase 2
- 10 Sites battle 2 phase 3
- 18 Sites battle 2 phase 6
- 72 Sites battle 2 Q2 AOP 2021
- 21 Sites battle 3 phase 1
- 28 Sites battle 6
2020 - 243 Sites Tuning activity Program 5 Cities
- 100 Sites Tuning Activity program AOP 2020
2010 – 2015 (Resource) - RF Engineer 2G,3G area Jabo
- OSS Isat Swap & Modernization area Jabo
- 2G,3G Isat MBC area Jabo
- Isat RF Eng NPI 3G Project area Jabo
- STS data processing Isat NPI Project area Jabo
- Isat 3G Project – RF Engineer area Jabo
Ericsson – Telkomsel (NDO / RF)
2022 - 33 sites program TELKOMSEL KALIMANTAN
2021 - 92 sites program TELKOMSEL KALIMANTAN 2022
- 5 sites program TELKOMSEL NPI 2021
- 3 sites program TSA Telkomsel SW Update 2021
- 5 sites program 5G Trial 2021
- 689 sites program L21 Massive 2021
- 991 sites program settlement 1 – 11 2021
- 92 sites program FNI, NPI, SW Upgrade 2021
2020 - 3 sites program supreme 2020
- 80 sites program roll out
2010 - 2016 (Resource) - RF Engineer 2G,3G area Sumbagut
- STS Engineer Tsel area Sumbagut
- NPI 2G, 3G RF area Sumbagut
- OSS Engineer Tsel area Sumbagsel
- Optimization 2G,3G Tsel area Kalimantan
- Tsel Kalimantan Optimization Workpackage
- Tsel Blue Eagle Drive Test area Kalimantan
Ericsson – XL (NDO / RF)
2022 (JABO) - 2 Sites Program 2020 - NDO JABO1
- 2 Sites Program 2021 - NDO JABO1
2021 (JABO) - 31 Sites Program Delorean 2021
- 253 Sites Program 2021 RAN Capacity Management
- 15 Sites program 2021 RAN Coverage
- 8 Sites 2021 RAN Coverage – Collo
- 120 Sites program 2021 RAN Coverage – Existing
- 8 Sites program 2021 Relocation & Capacity 3Mbps 2021
2022 (Central Java) - 2 Sites Program 2020 - Coverage
- 12 Sites Program 2021 - NDO 3G Sunset
- 19 Sites Program 2021 - NDO Capacity
- 111 Sites Program 2021 - NDO Capacity H2
- 10 Sites Program 2021 - NDO Coverage
- 160 Sites Program 2021 - NDO Coverage H2
- 5 Sites Program 2021 - NDO Upgrade LTC H2
- 3 Sites Program XL Central Java
2021 (Central Java) - 48 Sites Program Delorean 2021
- 4 Sites Program 2021 Frequency Refarming & 2021 RAN Capacity Upgrade LTC
- 631 Sites program 2021 RAN Capacity Management
- 229 Sites program 2021 RAN Coverage
- 436 Sites program 2021 RAN Coverage – Existing & 2021 RAN Coverage H2
- 47 Sites program 2021 Capacity 3Mbps 2021
2020 - 109 Sites Tuning & Optimization program JEDI 2020
- 9 Sites Tuning & Optimization program STP Relocation 2019
2010 - 2017 (Resource) - STS Engineer XL core
- XL NPI 2G,3G area Jabo
- XL NDO & Initial Tuning 2G, 3G Jabo
- XL Swap Central Java , RF & Optim Engineer
- XL Swap Central Java DT
- Tuning & Optimization Swap Antenna, Relocation (Project Sunrise)
- Tuning & Optimization Swap Antenna, Relocation (Project Orion)
Ericsson – Indosat (Site Engineering Survey)
2021 - 188 Sites activity site engineering survey program 2021
2020 127 Sites activity Site Engineering Survey (SES)
Huawei Hutchinson – TE
2019-2020 - 54 Sites Trial Implementation
Nokia XL – TE
2013-2014 - 104 sites implementation
Nokia IOH – TI & NPO
2022 - Kalimantan & EJ)
MyRepublic FTTH
2022 - Bekasi Area
- JakSel Area
Direct to Operator
2016 (STP Iforte - ZTE) - 108 New Site Pole 20M Internux area Jabodetabek
2013 – 2015 (Operator Indosat) - Activity Benchmark area Jabodetabek
- Activity Benchmark Main route, VIP route and Highway (Jakarta – Cikampek)
- Activity Benchmark Main route and VIP route area Central Java
2010 - 173 Relocation Site area Sumatera
2012 - 2021 (Operator XL) - As Tower Provider for rent to XL

TALENTA IMPLEMENTATION – HC & QUALITY

  • Evantama also has worked together with Talenta HC Systems, to make sure all the resources that we had, have more comfort in accessing their personal compensation and benefit.
  • This system is also implemented to make sure all the timesheets that project’s resources has, could be tracked easily and precisely, along with Virtual Attendances (Geolocation ready). These virtual attendances could be company’s tools to monitor team mobility and make sure their CICO (Clock In Clock Out) on site is on the target so our delivery quality may be improved more by how efficiently they come and finish work at site.
  • Available on web based & apps (IOS & Android)
PT. Evantama Network System
Komplek Ruko Tol Boulevard Blok A/26 BSD City, Tangerang Banten 15322
Telp. (021) 53158009     Fax. (021) 53158010     Email. info@ens-id.com
©  PT. EVANTAMA NETWORK SYSTEM 2020 ALL RIGHT RESERVED.